The price per metre is the headline number in almost every borehole quotation in Kenya. It is easy to compare, which is exactly why it can mislead. Rates range from a few thousand shillings to well over KSh 10,000 per metre, and the same figure can mean very different things depending on what is included. This article explains how per-metre pricing works, what the market ranges look like in 2026, and how to read a quotation critically.

Figures are indicative market ranges from Kenyan contractor and media sources and will change. Always obtain current written quotes.

What “Price per Metre” Normally Covers

At minimum, a per-metre rate pays for rig time, crew, fuel, drilling bits and basic mobilisation. Some contractors bundle in casing, gravel packing, development and test pumping; others quote the drilling rate alone and bill everything else separately. For example, one contractor’s published pricing lists roughly KSh 6,500 per metre inclusive of rig mobilisation, casing, gravel packing, 24-hour test pumping and water analysis, while noting mud drilling can be quoted from KSh 14,000 per metre. Another guide lists costs in a separate table for casing, gravel, development and test pumping. The same headline number can therefore be a bargain or a trap.

Market Ranges You Are Likely to See

Recent 2026 coverage of Nairobi-area pricing cites drilling at around KSh 6,500 to 9,500 per metre. Broader national guides quote much wider spreads, from around KSh 1,600 to over KSh 11,000 per metre, and other contractors publish tiered rates, with higher rates beyond 100 metres. Very low quotes, such as KSh 2,000 to 3,500 per metre, may describe shallow, soft-formation drilling or exclude major items, while very high quotes may reflect hard rock, mud drilling or large diameters.

The takeaway is that per-metre prices are not standardised, so compare scope before comparing numbers.

Why Prices Rise with Depth

Cost per metre often increases at deeper intervals for several reasons:

  • Longer drill strings and slower penetration.
  • Greater fuel and compressor demand.
  • Higher risk of hole instability.
  • More casing and heavier casing grades.
  • Greater wear on bits and hammers.

Some contractors publish stepped rates, for instance one rate for 0 to 100 metres and a higher rate beyond. Always ask for the rate at each depth band, since many Nairobi-area boreholes extend beyond 150 metres.

Geology and Drilling Method Drive the Rate

Hard crystalline rock, abrasive volcanic layers or alternating hard and soft formations wear equipment quickly. Loose sands, gravels and clays may collapse and require mud drilling with drilling fluid, which raises cost per metre but is sometimes the only way to complete the hole. Percussion drilling is slower (often 5 to 10 metres a day) and generally suits shallow holes, while rotary rigs cover greater depths faster.

Diameter Matters More Than Many Clients Realise

A standard domestic borehole may be drilled at about 8 inches (about 200 mm) and cased with 6-inch casing. Larger diameters may be required for high-yield or irrigation boreholes where bigger pumps are installed. Larger holes cost more because they remove more rock, need heavier equipment and consume more casing and gravel. Ask what diameter is priced and why it was chosen.

Items Often Billed Outside the Per-Metre Rate

Check whether these are included or extra:

  • Mobilisation and demobilisation of the rig.
  • Uncased drilling versus cased metres.
  • uPVC or steel casing and screens.
  • Gravel pack, cement grout and sanitary seal.
  • Borehole development.
  • Test pumping and recovery monitoring.
  • Water analysis.
  • Wellhead protection and headworks.
  • Survey, permits and completion report.

Published casing prices range widely, from roughly KSh 800 to 1,500 per metre for uPVC in some contractor lists to higher ranges for steel, depending on diameter and thickness. Test pumping and gravel pack are often quoted at a few hundred shillings per metre in itemised tables.

Worked Example: Comparing Two Quotes

Suppose a 180-metre borehole is quoted by two companies.

  • Company A: KSh 6,500 per metre inclusive of casing, gravel, development, 24-hour test pumping and water analysis: about KSh 1,170,000.
  • Company B: KSh 5,000 per metre for drilling only: KSh 900,000. Add casing for 180 metres at KSh 1,500 (KSh 270,000), gravel and development (say KSh 90,000), test pumping (KSh 60,000) and water analysis (KSh 20,000): about KSh 1,340,000.

Company B looked cheaper per metre but is more expensive overall once like-for-like scope is applied. Always convert quotes to a total for the same specification.

How Uncertainty Is Handled in Contracts

Because final depth is unknown until the hole is drilled, contracts should state:

  • The estimated depth and the rate for each additional metre.
  • The rate when hard rock or mud drilling is encountered.
  • Whether casing is charged per metre installed or by the length purchased.
  • What is payable if the borehole is dry or abandoned, including backfilling and sealing.

Without such clauses, disputes arise exactly when money is at stake.

Red Flags in Per-Metre Pricing

  • A rate far below all other quotations with no scope detail.
  • No mention of casing grade or diameter.
  • Verbal-only rates and no written contract.
  • Pressure to commit before a survey is done.
  • Hidden “per metre” charges for each activity not disclosed up front.

How to Use Per-Metre Prices Wisely

Use the per-metre rate as a starting point, then ask: What does it include? At what depth does it change? What diameter and casing are assumed? What are the extras? What is the dry-hole policy? Convert each quote into a total cost for a defined depth, such as 150 and 200 metres, and compare totals.

Final Thoughts

Per-metre pricing is a useful shorthand, not a complete price. In Kenya’s varied geology, depth, drilling method, diameter and inclusions all change what you actually pay. Clients who insist on itemised scopes and tiered rates protect themselves from budget surprises.

Sources and Further Reading

  • The Kenya Times, “Cost of Drilling a Borehole in Nairobi” (June 2026).
  • Beyond Forest, “Borehole Drilling Cost in Kenya 2026.”
  • Published contractor pricing pages from Kenyan drilling providers (2025–2026).
  • ICRC, Borehole Drilling and Rehabilitation under Field Conditions.

Spread by sharing

Geol Githae

Geol. Mbugua Githae is a dedicated and skilled geologist with expertise in geological mapping, mineral exploration, and geotechnical investigations. With a strong academic background and hands-on experience in both field and laboratory settings, he brings a practical, analytical approach to solving complex geological challenges. Passionate about sustainable resource development and environmental stewardship, Geol. Githae continues to contribute meaningfully to the advancement of earth sciences in the region.