A newly drilled borehole that “gives water” is not yet a reliable water supply. How much water it can deliver, for how long and at what pumping depth are questions that only a proper yield test can answer. In Kenya, where groundwater is regulated and often under pressure, yield testing protects your investment, your pump and the aquifer. This article explains what a yield test is, how it is done and how to read the results.
What Is Borehole Yield?
Yield is the volume of water a borehole can supply over time, usually expressed in cubic metres per hour (m³/h) or litres per second. Three related ideas are important:
- Blow yield: a rough estimate measured during drilling by airlifting, using compressed air. It is useful for decisions on site but not reliable for design.
- Test yield: the rate sustained during a controlled pumping test.
- Safe (sustainable) yield: the rate at which the borehole can be pumped long term without excessive drawdown, damage to the aquifer or deterioration in water quality. This is the figure that should guide pump selection and permit applications.
Safe yield is almost always lower than the maximum rate at which a pump can be forced to deliver for a few hours.
Why a Yield Test Is Essential
- Correct pump sizing: an oversized pump will draw the water level down to the intake, run dry, overheat and fail. An undersized pump wastes the borehole’s potential.
- Protecting the aquifer: overpumping lowers water levels, can draw in poor-quality water and affects neighbouring boreholes.
- Regulatory compliance: the Water Resources Regulations 2021 address borehole test pumping and require completion records. WRA uses these data to set permitted abstraction.
- Budget protection: test results let you decide whether to invest in pumps, solar systems and storage, or to treat the borehole as a low-yield source.
- Evidence in disputes: documented tests show what the contractor delivered and what the borehole can realistically do.
- Early warning: baseline data allow you to detect future decline.
Key Terms in a Pumping Test
- Static water level (SWL): the resting water level before pumping begins.
- Pumping water level (PWL): the water level during pumping.
- Drawdown: the difference between SWL and PWL.
- Specific capacity: yield divided by drawdown (for example m³/h per metre), a quick indicator of borehole performance.
- Recovery: how quickly the water level rises after pumping stops.
- Transmissivity and storativity: aquifer properties derived from test data by hydrogeologists.
Types of Pumping Test
Step-drawdown test. The borehole is pumped at a series of increasing rates, often three to five steps of one to a few hours each, with drawdown recorded. It shows how efficiently the borehole performs at different rates and helps select the rate for the long test. Water levels must recover before the next test.
Constant-rate test. The borehole is pumped at a fixed rate for an extended period. In Kenya, contractors commonly use at least 24 hours, and 48 to 72 hours for larger or more critical supplies. This test reveals whether the water level stabilises or continues to fall, which is a key sign of sustainability.
Recovery test. After the pump is switched off, water levels are measured until they return near the static level. Good recovery suggests healthy aquifer recharge. Slow or incomplete recovery warns of limited storage or boundaries.
How a Test Is Conducted
- Preparation: borehole development is completed, a test pump of suitable capacity is installed, discharge is piped away from the borehole to avoid recirculation, and a flow measurement device is fitted.
- Baseline: the static water level is measured and recorded.
- Step test: pumping at increasing rates with frequent water-level readings, for example every minute at the start and less often later.
- Rest period: full or near-full recovery before the main test.
- Constant-rate test: pumping at a steady rate, with discharge checked regularly and kept within a small tolerance, such as about 10 percent.
- Water sampling: samples are taken near the end of pumping for chemical and bacteriological analysis.
- Recovery: pump off, then readings continue until levels stabilise.
Where possible, nearby boreholes should be monitored to detect interference, which helps in assessing neighbourhood impacts.
Interpreting Results
- Stabilised drawdown: if the water level stops dropping after a few hours, the borehole is likely supported by good recharge at that rate.
- Continuing steady decline: the rate may be too high for the aquifer, or boundaries (such as the edge of a fracture zone) are limiting supply.
- Sudden drop in level: possible dewatering of a water-bearing layer, so the pump intake and screens should be reviewed.
- Rapid recovery: typically indicates good aquifer properties.
- Turbid or sandy discharge: sign of incomplete development or screen problems.
- Water quality changes during the test: may indicate that different layers contribute at higher drawdown.
A hydrogeologist uses these data to recommend a safe yield, pump setting depth and daily operating schedule, for example limiting pumping to a set number of hours per day.
Practical Examples
Suppose a borehole has an SWL of 40 metres. At 5 m³/h, drawdown stabilises at 12 metres after six hours. At 10 m³/h, drawdown keeps increasing past 30 metres after 12 hours. A sensible recommendation might be a design rate near 5 to 6 m³/h, not the 10 m³/h the pump could physically deliver for a short period. Pumping the borehole at the higher rate would risk dewatering and pump damage.
Common Mistakes
- Using blow-yield from drilling as the design yield.
- Running the test for only a few hours and calling it complete.
- Pumping at variable rates during the “constant-rate” test.
- Failing to measure discharge accurately.
- Discharging water next to the borehole so it recirculates.
- Testing without prior development.
- Skipping the recovery phase.
- Not recording the data and sharing them with the client.
What Your Test Report Should Contain
- Borehole identification and location, depth and construction details.
- Pump type, intake depth and discharge measurement method.
- Step test and constant-rate test tables and graphs.
- SWL, maximum drawdown, specific capacity and recovery data.
- Recommended pumping rate, hours of operation and pump setting.
- Water quality results and observations on turbidity or sand.
- Name and signature of the person who supervised the test.
Cost and Contract Considerations
Test pumping may be included in the per-metre rate or billed separately, and longer tests cost more because of fuel, equipment and personnel time. The extra cost is small compared with the cost of a ruined pump or a failed borehole. Specify the minimum duration, step and recovery requirements in the contract.
Final Thoughts
A pumping test turns uncertainty into numbers. In Kenya’s variable aquifers, it is the most reliable way to size equipment, meet regulatory requirements and manage groundwater sustainably. Insist on a properly conducted, documented test before you buy a pump or sign off on your borehole.
Sources and Further Reading
- Water Resources Regulations 2021 (Legal Notice No. 43 of 2021), Regulation 53 (borehole and well test pumping) and Regulation 55 (completion record).
- Kenyan contractor technical notes on test pumping, typically 24 to 72 hours.
- Technical guidance on step-drawdown, constant-rate and recovery testing from international regulators and water authorities.
- ICRC, Borehole Drilling and Rehabilitation under Field Conditions.