Cost of a Mining Feasibility Study in Kenya
Spread by sharing

“How much will a feasibility study cost?” is usually the first question a mine owner or investor asks, and the honest answer is: it depends. A study for a small alluvial gold operation in western Kenya and a study for a large industrial minerals mine near the coast are very different undertakings. Understanding what drives cost helps you budget realistically, compare consultant proposals fairly and avoid paying twice for work that was done poorly the first time.

This article explains the main factors that influence the cost of a mining feasibility study in Kenya, how costs differ by study stage, and practical ways to manage spending without compromising quality.

Why There Is No Single Price

A feasibility study is not an off-the-shelf product. It is a bundle of technical work packages, and the size of each package depends on the deposit, the data already available and the level of accuracy required. Published figures from international practice are often expressed as a small percentage of the expected capital cost of the project, with feasibility-level work commonly quoted in the range of roughly one to three percent, and lower percentages applying to very large projects. These are rules of thumb, not quotations, and they should be treated with caution for small Kenyan projects where fixed costs make percentages less reliable.

Cost by Study Stage

Costs rise at each stage because the work becomes more detailed.

Scoping study (preliminary economic assessment). This is the least expensive stage. It relies largely on existing data, benchmarks and desktop analysis, with limited new fieldwork. Its purpose is to decide whether further spending is justified.

Pre-feasibility study. Costs increase because drilling, preliminary metallurgical test work, initial mine design and baseline environmental data are required. The study narrows options and identifies the preferred development path.

Definitive feasibility study. This is the most expensive stage. It typically includes infill drilling to upgrade resource classification, detailed metallurgical programmes, geotechnical and hydrogeological investigations, detailed engineering, full environmental and social impact assessment, and a bankable financial model.

For small-scale projects, a combined or simplified study may be adequate, but lenders and licensing authorities will still expect the key technical and financial elements to be addressed.

Main Cost Drivers

1. Drilling and Sampling. Drilling is usually the single largest cost component. Diamond (core) drilling is more expensive than reverse circulation (RC) drilling but provides better geological and geotechnical information. Costs depend on the number and depth of holes, rock hardness, drilling method, access, water supply and rig mobilisation to remote sites. Sample preparation and assay costs add to the total, particularly if metallurgical composites are required.

2. Deposit Size and Complexity. Large, structurally complex or nuggety deposits need more data to reach the same confidence. For example, coarse gold in quartz veins often requires larger samples and tighter drill spacing than a bulk-tonnage disseminated deposit.

3. Existing Data Quality. If previous owners left reliable drilling records, maps and QA/QC data, the study is cheaper. If data is missing or unreliable, it may need to be validated or redone. Re-logging core, re-assaying pulps and re-surveying collars are common tasks that add cost but protect credibility.

4. Metallurgical Test Work. Test programmes range from simple bottle-roll leach tests to comprehensive comminution, gravity, leach, flotation and variability testing. Costs depend on ore complexity, number of composites and the laboratory used. Refractory or polymetallic ores cost more to characterise.

5. Geotechnical and Hydrogeological Investigations. Pit slope stability, underground ground conditions, dewatering requirements and water supply must be understood. These studies require specialist input, drilling or test pumping, and instrumentation.

6. Environmental and Social Studies. An ESIA submitted to the National Environment Management Authority (NEMA) requires baseline surveys, such as air, noise, water, soils, biodiversity and socio-economic studies, and public participation. Seasonal sampling can extend timelines and cost. Community engagement and, where relevant, resettlement planning also add expense.

7. Engineering and Infrastructure Design. Process plant design, tailings storage facility design, power supply, water supply, roads and camps all require engineering input. Remote locations with no grid power or poor road access increase design complexity.

8. Survey and Mapping. Topographic surveys, drone mapping, LiDAR or photogrammetry provide base data for mine design. Costs depend on area and required accuracy.

9. Financial Modelling and Legal Review. Financial model development, tax and royalty analysis, and legal due diligence on mining rights, land tenure and agreements require specialist advisers.

10. Independent Review. Lenders frequently require an independent technical review. This is an additional but worthwhile cost for externally financed projects.

Kenya-Specific Cost Considerations

Logistics and access. Many prospective mining areas have poor roads that become impassable in the rainy season. Fuel, vehicle hire and camp costs can be significant. Planning fieldwork in the drier months reduces delays.

Regulatory and permitting costs. Licence fees, environmental assessment fees and water permit costs are set by regulation and can change. Confirm current amounts with the Ministry, NEMA and the Water Resources Authority.

Community engagement. Early, meaningful engagement is both a legal expectation and a risk-management measure. Budgeting for meetings, translators, liaison staff and social baseline surveys is wise.

Laboratory access. Some analyses can be done in Kenya, while specialised work may be sent to accredited laboratories in the region or overseas, adding shipping, customs and time costs. Ensure that laboratories hold relevant accreditation, such as ISO/IEC 17025.

Currency and inflation. Many costs, such as drilling contracts and laboratory work, are tied to the US dollar or imported inputs. Exchange rate movements can affect budgets.

Illustrative Budget Structure

Rather than quote specific figures, which vary widely, it is more useful to understand how a typical budget might be divided. For a drilling-heavy feasibility programme, drilling and sampling often account for the largest share, followed by engineering design, metallurgical test work, environmental and social studies, and project management and reporting. For desktop-heavy early-stage studies, consulting time and data review dominate. Always request a work breakdown structure from consultants, with each task priced separately, so that you can see where the money goes.

How to Compare Quotations

Two proposals with different totals may not be comparable. Check:

  • Scope: Does each include fieldwork, laboratory costs, travel and site visits, or are they excluded?
  • Deliverables: Is the report, resource model, financial model and drawings included?
  • Reporting standard: JORC, NI 43-101 or SAMREC compliance often increases effort.
  • Personnel: Who will work on the project, and at what seniority?
  • Assumptions: Number of drill metres, number of samples and number of test composites.
  • Variation clauses: How will additional work be priced?

Choose the offer that gives the clearest scope and the best value, not necessarily the lowest price.

Practical Ways to Manage Costs

Stage the work. Do not jump to a full feasibility study before a scoping or pre-feasibility study shows the project is promising. This can save significant sums if the project is not viable.

Use existing data wisely. Compile and validate historical data before commissioning new work. Government geological maps and previous exploration reports may reduce duplication.

Target drilling. Use geological mapping, geophysics and sampling to focus drilling on areas that matter. Wasted metres are the most expensive error.

Plan fieldwork seasonally. Avoid heavy rains that halt drilling or increase access costs.

Combine programmes. One drilling campaign can often serve resource, metallurgical and geotechnical objectives if planned at the start.

Set clear decision gates. Define in advance what results would justify continuing, redesigning or stopping, so that money is not spent on a failing project.

Keep a contingency. Unforeseen delays or additional drilling are common. A contingency of about ten to twenty percent is often prudent, depending on risk.

The Cost of Doing It Cheaply

Cutting corners on a feasibility study is a false economy. Inadequate sampling can lead to an Inferred-only resource that banks will not finance. Poor metallurgical testing can result in a plant that recovers less than expected. Ignoring environmental baselines can delay approvals. In each case, the cost of correcting mistakes later exceeds the savings made earlier. The aim is not the cheapest study but the most reliable study for the decision at hand.

Funding the Study

Options include owner equity, joint ventures with larger companies, strategic investors, royalty or streaming agreements, and, for suitable projects, development finance or grants. A well-defined scoping study often helps attract partners willing to fund the next stage in exchange for project equity. Be transparent about data quality and risks when approaching funders.

Conclusion

The cost of a mining feasibility study in Kenya depends on the stage of work, the size and complexity of the deposit, the quality of existing data, the amount of drilling and test work required, environmental and social obligations, and the remoteness of the site. Rather than searching for a single number, focus on understanding cost drivers, requesting detailed work breakdowns, staging the programme and investing in quality where it matters most. A carefully scoped and well-managed study is one of the best investments a mining project can make.

For help defining the scope of a geological or feasibility programme, visit consult.innercoregeoconsultants.co.ke.

This article provides general guidance only. Request written quotations and confirm current regulatory fees before budgeting.


Spread by sharing

Geol Githae

Geol. Mbugua Githae is a dedicated and skilled geologist with expertise in geological mapping, mineral exploration, and geotechnical investigations. With a strong academic background and hands-on experience in both field and laboratory settings, he brings a practical, analytical approach to solving complex geological challenges. Passionate about sustainable resource development and environmental stewardship, Geol. Githae continues to contribute meaningfully to the advancement of earth sciences in the region.