Finding a mineral deposit is only half the challenge. The other half is extracting the valuable mineral from the rock in a form that can be sold. A deposit with excellent grade may still fail if its ore resists recovery, requires expensive reagents or produces a product that markets will not accept. This is why mineral processing feasibility studies are a critical part of any mining project assessment.
This article explains what a mineral processing feasibility study involves, how test work is designed, how process routes are chosen for gold and other ores and what Kenyan project owners should consider.
What Is a Mineral Processing Feasibility Study?
A mineral processing feasibility study evaluates how ore can be treated to produce a saleable product, at what recovery, at what cost and with what environmental and social impact. It combines laboratory test work, process design, equipment selection, cost estimation and risk assessment. The results feed directly into the overall feasibility study and financial model.
Why Processing Studies Matter
Metallurgical recovery is one of the strongest drivers of project value. If a study assumes 90 percent gold recovery and the plant achieves 75 percent, revenue falls sharply and the project can become uneconomic. Processing studies reduce this risk by testing the ore before the plant is built. They also determine capital and operating costs, water and energy needs, tailings characteristics and environmental risk.
Step 1: Sample Selection and Representativity
Good metallurgical work starts with the right samples. Samples must represent the orebody in terms of grade, mineralogy, weathering state, lithology, and spatial distribution. A common error is testing only high-grade or convenient material. Best practice includes:
- Selecting composites from drill core or bulk samples that reflect different ore types and zones.
- Separating oxide, transition and fresh ore, because their behaviour differs.
- Testing variability samples to understand how recovery changes across the deposit.
- Preserving samples properly to avoid oxidation or contamination.
Sampling for metallurgy should be planned together with drilling so that sufficient core or bulk material is available.
Step 2: Mineralogical Characterisation
Understanding what minerals are present, their grain size, association and liberation characteristics guides process selection. Techniques include optical microscopy, X-ray diffraction, scanning electron microscopy and automated mineralogy. For gold ores, key questions are whether gold is free or locked in sulphides, the size of gold grains, and the presence of elements such as arsenic, copper, sulphur or carbonaceous material that interfere with recovery.
Step 3: Test Work Programme
A staged programme typically includes:
Comminution testing. Crushing and grinding tests, such as Bond work index and abrasion index, determine energy requirements and equipment sizing. Hard ore needs more energy and costs more to grind.
Gravity recovery tests. Where free gold is present, gravity concentration with jigs, shaking tables or centrifugal concentrators can recover a significant fraction cheaply and reduce reliance on chemicals.
Cyanide leach tests. Bottle-roll tests provide an early indication of leachability. Column tests simulate heap leaching. Carbon-in-leach (CIL) and carbon-in-pulp (CIP) tests assess gold adsorption and reagent consumption.
Flotation tests. For sulphide-hosted gold or base metal ores, flotation concentrates valuable minerals. Concentrates may then be sold or further treated.
Refractory ore tests. Where gold is locked in sulphides, oxidation processes such as roasting, pressure oxidation or bacterial oxidation may be needed. These raise capital and operating cost significantly.
Solid-liquid separation and tailings tests. Thickening, filtration and rheology tests inform plant and tailings design.
Environmental characterisation. Acid-base accounting and leach tests on waste rock and tailings assess acid mine drainage and contaminant risk.
Process Options for Gold
Gravity-only circuits. Simple, low-cost and suited to ores with coarse free gold. Often used in smaller operations, but recovery may be limited if fine gold is present.
Cyanide leaching (CIL/CIP). The dominant method for most hard-rock gold. Ore is ground, mixed with cyanide solution and activated carbon, and gold is adsorbed, eluted and recovered. It offers high recovery for free-milling ores but demands strict cyanide management.
Heap leaching. Crushed ore is stacked on lined pads and irrigated with cyanide solution. It has lower capital cost and suits low-grade, oxidised ores, but recovery is typically lower and slower than milling.
Flotation and concentrate treatment. Used for sulphide ores where gold is associated with pyrite or arsenopyrite. A concentrate is produced for sale or further processing.
Oxidative pretreatment. For refractory ores, pretreatment liberates gold prior to leaching.
Alternatives to mercury. In artisanal settings, mercury amalgamation is widespread but harmful to health and the environment. Gravity concentration with safer methods and centralised processing facilities offer better alternatives and are increasingly required by lenders and international standards.
Processing Other Ores
Base metals (copper, lead, zinc). Typically processed by crushing, grinding and flotation to produce concentrates.
Industrial minerals (fluorspar, limestone, gypsum, kaolin, diatomite). Processing often involves crushing, screening, washing, flotation or calcination to meet product specifications for purity, particle size or brightness.
Heavy mineral sands. Gravity separation, magnetic and electrostatic separation are used to produce ilmenite, rutile and zircon concentrates.
Iron ore and manganese. Crushing, screening and magnetic or gravity beneficiation to improve grade.
Soda ash and evaporite minerals. Processing often involves brine handling and evaporation or chemical treatment.
Gemstones. Recovery typically relies on careful gravity separation and manual sorting rather than chemical processing, with an emphasis on avoiding damage to stones.
Process Design and Engineering
Once the process route is selected, engineers prepare a flowsheet, mass and water balances, equipment lists and layouts. The design includes crushing, grinding, leaching or flotation circuits, thickening, tailings disposal, reagent handling, power and water systems and control systems. For smaller Kenyan projects, modular plants may reduce capital cost and construction time. Design should consider ease of maintenance, spare parts availability and operator skills.
Capital and Operating Cost Estimation
Capital costs cover equipment, civil works, installation, infrastructure, indirect costs and contingency. Operating costs include labour, power, reagents, consumables, maintenance, water and tailings management. The study should state accuracy and assumptions. In Kenya, equipment import duties, transport to site, power reliability and skilled labour availability influence costs. Test work results, such as reagent consumption and energy requirement, provide critical inputs.
Environmental and Social Aspects of Processing
Processing plants can pose environmental risks, including cyanide use, tailings storage, dust, noise, water consumption and effluent discharge. A feasibility study should identify these risks and propose controls, including cyanide management practices consistent with international standards, lined and monitored tailings facilities, water recycling and closure planning. Engage the community early, as concerns about water and chemicals are common. Approvals from NEMA and the Water Resources Authority are required.
Selecting a Laboratory
Choose metallurgical laboratories with relevant experience, appropriate equipment, quality systems and a track record with similar ore types. Confirm turnaround times, sample security and the ability to scale up to pilot testing if needed. Independent review of test results by a metallurgist who is not involved in the testing adds credibility.
Common Pitfalls
- Testing unrepresentative samples.
- Ignoring variability across ore types.
- Extrapolating bottle-roll results directly to plant recovery without adjustment.
- Underestimating reagent consumption or impurity effects.
- Overlooking grind size optimisation.
- Neglecting tailings and water management.
- Selecting technology that local staff cannot operate or maintain.
Scale-Up from Laboratory to Plant
Laboratory results rarely transfer perfectly to full-scale operation. Differences in grind size, mixing, residence time, water chemistry and ore variability can reduce recovery. Studies therefore apply scale-up factors, use pilot testing for higher-risk circuits and include commissioning and ramp-up periods in schedules. Documenting how laboratory results were adjusted to design values makes the study more credible to reviewers.
Water and Energy Considerations in Kenya
Processing plants consume water and energy, and both can be constraints. In dry regions, water recycling, thickening and dry-stack tailings may reduce demand. Grid reliability and tariffs influence the choice between grid power, diesel generation, solar hybrids or other sources. Include realistic power and water costs and secure the necessary permits early.
Product Quality and Marketing
For industrial minerals and concentrates, processing must deliver a product that meets buyer specifications. Test work should therefore measure particle size, purity, moisture and deleterious elements, and results should be compared with typical market requirements. Engage potential buyers early, since specification changes can alter the process design and cost.
Reporting the Results
A processing chapter in a feasibility study should present sample origins, test methods, results, design criteria, flowsheets, mass balances, equipment lists, cost estimates and risks, with test reports in appendices. State recovery assumptions and their basis plainly, and show how results were adjusted for scale-up. Transparent reporting helps independent reviewers and lenders judge the reliability of the process case.
Conclusion
A mineral processing feasibility study connects geology to revenue. By characterising the ore, conducting representative test work, selecting an appropriate process route and estimating costs and risks realistically, it determines whether a deposit can become a profitable operation. For gold and other ores in Kenya, attention to variability, environmental management, local infrastructure and responsible practice is essential. A thorough processing study reduces technical risk and strengthens the case for investment.
For help linking geological data to metallurgical planning, visit consult.innercoregeoconsultants.co.ke.
This article is general guidance. Process selection should be confirmed by qualified metallurgists using representative test work.