Bankable Mining Feasibility Study Include?
Spread by sharing

A bankable feasibility study is a study that a lender is prepared to rely on when deciding whether to finance a mine. The word “bankable” is not a legal term, and no report is bankable simply because its author says so. It earns that description when banks, development finance institutions and their independent advisers examine it and conclude that its data, methods, assumptions and conclusions are reliable enough to lend against.

This article sets out what a bankable mining feasibility study should include, what lenders look for and how project owners in Kenya can prepare a study that survives due diligence.

What “Bankable” Really Means

Lenders ask a simple question: will this project generate enough cash, with enough certainty, to repay our loan? A bankable study answers it with evidence. It demonstrates that the resource is real, the mine can be built and operated as designed, the product can be sold, the permits are secured or obtainable and the financial returns hold up under stress. It also shows that risks have been identified, quantified and assigned to parties able to manage them.

Because lenders carry downside risk without sharing the upside, they are conservative. They scrutinise assumptions, test sensitivities and often commission an independent technical consultant to review the study.

1. A Reliable Mineral Resource and Reserve Statement

The foundation is a mineral resource and ore reserve estimate prepared under a recognised code (JORC, NI 43-101 or SAMREC) by a Competent or Qualified Person who is independent where required. Lenders look for:

  • Adequate drilling density to support Indicated and Measured categories.
  • Documented sampling, assay and QA/QC procedures, with evidence of accuracy and precision.
  • Verified drill hole data and validated databases.
  • Justified bulk density, grade capping and estimation methods.
  • A reserve statement showing how resources were converted using realistic modifying factors.
  • Clear separation of Inferred resources, which should not support the core financial case.

Weak or poorly documented data is the most common reason studies fail due diligence.

2. Mining Method, Design and Schedule

The study should present a clear mining plan, including:

  • Justification of the chosen mining method.
  • Geotechnical and hydrogeological studies supporting pit slopes, underground design and dewatering.
  • Mine design, production schedule, dilution and ore loss assumptions.
  • Equipment selection and workforce plan.
  • Grade control and reconciliation strategy.

Schedules should be realistic, with ramp-up periods and consideration of seasonal constraints.

3. Metallurgical Test Work and Process Design

Process assumptions must be backed by representative test work, not by analogy alone. A bankable study typically includes:

  • Characterisation of ore types and variability across the deposit.
  • Comminution (crushing and grinding), recovery and reagent consumption tests.
  • Pilot or bulk testing where risk is significant.
  • Process flowsheet, plant design, mass and water balances.
  • Product quality and marketing specifications.
  • Evaluation of deleterious elements and their effects.

Lenders are particularly alert to overstated recovery, since small changes have large financial effects.

4. Infrastructure, Logistics and Utilities

A mine depends on supporting systems. The study should address:

  • Power supply, including source, capacity, reliability and tariff.
  • Water supply, with permits and sustainability assessment.
  • Road, rail and port access, and transport contracts.
  • Tailings storage facility design and waste rock management by qualified engineers, with stability and closure considerations.
  • Accommodation, communications and security.

In Kenya, power reliability, haulage routes and water availability often shape costs, so detailed assessment is important.

5. Capital and Operating Cost Estimates

Cost estimates should be built from the bottom up, using quotations, engineering quantities and benchmarked unit rates. The study should state its accuracy range and contingency, and identify escalation, currency and taxes. Lenders will compare costs with similar operations and challenge unusually low figures.

6. Marketing and Offtake

A project must be able to sell its product. The study should include market analysis, expected price outlook, product specifications, customer identification and, ideally, offtake agreements or letters of intent. For gold, refining and sales arrangements, security and transport should be defined. For industrial minerals, proximity to customers and quality consistency are critical.

7. Legal, Licensing and Land Tenure

Lenders want certainty over the right to mine. The study should confirm:

  • Validity and conditions of the mining licence and its relationship to prospecting or retention rights.
  • Compliance with the Mining Act, 2016, and associated regulations.
  • Land ownership, access rights, easements and surface rights, including any community land considerations.
  • Government participation and royalty obligations.
  • Local content, community development and benefit-sharing commitments.
  • Absence of disputes, overlapping claims or encumbrances.

Legal due diligence by a qualified Kenyan lawyer is normally required.

8. Environmental and Social Impact Assessment

Approvals under the Environmental Management and Coordination Act, administered by NEMA, are essential. Lenders also commonly apply international standards such as the IFC Performance Standards and the Equator Principles. A bankable study includes:

  • A completed or well-advanced ESIA, with baseline data and mitigation measures.
  • Environmental and social management plans.
  • Stakeholder engagement records and grievance mechanisms.
  • Resettlement and livelihood restoration plans, where relevant.
  • Water, tailings, air quality, biodiversity and waste management plans.
  • A mine closure and rehabilitation plan with cost estimate and financial provision.

Projects that neglect social licence risk delays and funding withdrawal.

9. Health, Safety and Security

The study should outline occupational health and safety systems, emergency response, training, and security arrangements. A credible safety culture is a lender requirement and a predictor of operational performance.

10. Financial Model and Sensitivity Analysis

The financial model should be transparent, consistent and auditable. It should include:

  • Production schedule, revenue, operating costs and capital expenditure.
  • Royalties, taxes, duties, working capital and closure costs.
  • Debt and equity structure, interest, repayment profile and debt service cover ratio.
  • Net present value, internal rate of return, payback and cash flow.
  • Sensitivity analysis to commodity price, grade, recovery, capital cost, operating cost and exchange rate.
  • Downside and base cases, and a lender case with conservative assumptions.

Lenders pay close attention to debt service cover and the ability to withstand stress.

11. Project Execution Plan

The study should detail how the project will be built: contracting strategy, schedule, procurement, construction management, commissioning and ramp-up. It should identify critical path items and risks such as equipment lead times and weather.

12. Risk Assessment and Mitigation

A risk register should identify geological, technical, financial, regulatory, social, environmental, security and market risks, with likelihood, impact and mitigation measures. Lenders favour studies that identify risks honestly over those that present an unrealistically smooth picture.

13. Management, Governance and Owner’s Team

Lenders assess the capability of the sponsor and management team, including experience, track record and governance. The study should describe organisational structure, key personnel and plans for recruiting and training, including local employment.

14. Independent Review

Most lenders commission an independent technical expert to audit the study. Preparing for this review by organising data, documenting assumptions and having an experienced consultant conduct a pre-review improves the chances of a smooth process.

Common Reasons Studies Fail Due Diligence

  • Insufficient drilling or poor QA/QC.
  • Unrepresentative metallurgical test samples.
  • Optimistic recovery, price or cost assumptions.
  • Unresolved land tenure or permitting issues.
  • Incomplete environmental and social work.
  • Lack of offtake or market analysis.
  • Authors lacking relevant qualifications or independence.
  • Financial models with errors or untested assumptions.

A Pre-Submission Checklist

Before sending a study to lenders, confirm that: resources and reserves are signed by qualified persons; QA/QC evidence is included in an appendix; metallurgical test reports are complete; capital and operating cost estimates have clear bases and contingency; licences, land access and key permits are documented; the ESIA and stakeholder records are complete; offtake or marketing arrangements are described; the financial model has been audited for errors; and a risk register with mitigation is included. Use this list to find weaknesses before an independent engineer does.

Timeline and Cost of Becoming Bankable

Bringing a project to bankable status often takes longer than owners expect, because drilling, test work, baseline monitoring and permitting run in sequence. Allow time for independent review and for responding to lender questions. Budget accordingly, and consider staging the programme so that early results can be used to attract funding for later work.

Presentation and Clarity

Even technically strong studies can fail to persuade if they are poorly organised. Use a clear structure, an executive summary that states key assumptions and results plainly, consistent units and tables that can be checked against appendices. Explain limitations openly. Lenders trust studies that acknowledge uncertainty more than those that present an unrealistically perfect picture.

Conclusion

A bankable mining feasibility study is comprehensive, evidence-based and conservative. It combines a reliable resource and reserve, a proven process, realistic engineering and costs, secured rights, credible environmental and social management and a robust financial case. For projects in Kenya, close attention to the Mining Act, NEMA requirements, community engagement and infrastructure realities is especially important. By preparing the study with lenders in mind and inviting independent review early, project owners greatly improve their chances of securing finance.

For support preparing technical data for investor and lender review, visit consult.innercoregeoconsultants.co.ke.

This article is general guidance. Lender requirements vary, and projects should seek specialist legal, financial and technical advice.


Spread by sharing

Geol Githae

Geol. Mbugua Githae is a dedicated and skilled geologist with expertise in geological mapping, mineral exploration, and geotechnical investigations. With a strong academic background and hands-on experience in both field and laboratory settings, he brings a practical, analytical approach to solving complex geological challenges. Passionate about sustainable resource development and environmental stewardship, Geol. Githae continues to contribute meaningfully to the advancement of earth sciences in the region.