A mineral resource estimate is the point at which geology becomes an asset. It states, in tonnes and grade, how much mineralisation exists in a deposit and how confident geologists are in that figure. Investors use it to value a project, engineers use it to design a mine, and regulators and stock exchanges rely on it as a public statement of fact. Because so much depends on it, resource estimation is governed by strict professional standards.
This article explains how mineral resource estimation works, what data it requires, the main estimation methods, how resources are classified and what a good technical report contains, with a focus on projects in Kenya.
What Is a Mineral Resource?
Under the CRIRSCO-aligned codes, which include JORC (Australasia), CIM Definition Standards used with NI 43-101 (Canada) and SAMREC (South Africa), a mineral resource is a concentration of material in or on the Earth’s crust in such form, grade and quantity that there are reasonable prospects for eventual economic extraction. Its location, quantity, grade, continuity and other geological characteristics are known, estimated or interpreted from specific geological evidence.
A resource is not the same as a reserve. A reserve is the economically mineable part of a resource after applying mining, processing, economic, legal, environmental and social factors. Resources come first, and reserves are derived from them.
Resource Classification
Resources are divided into three categories reflecting increasing geological confidence:
Inferred. Tonnage and grade are estimated with low confidence, based on limited sampling. Geological continuity is assumed rather than verified. Inferred resources may not be used alone to support reserves or detailed economic studies.
Indicated. Confidence is sufficient to apply modifying factors and support mine planning. Data density allows geological continuity to be reasonably assumed.
Measured. The highest confidence. Continuity of geology and grade is confirmed by dense, high-quality data.
Classification is a matter of professional judgement made by the Competent Person (JORC) or Qualified Person (NI 43-101), guided by drill spacing, geological understanding, data quality and grade variability.
Data Required for Resource Estimation
A defensible estimate depends on high-quality input data:
- Drill hole collars and surveys. Accurate three-dimensional positions of holes, verified by surveyors, with downhole deviation measurements.
- Geological logs. Consistent lithology, alteration, structure and mineralisation descriptions.
- Sampling and assay data. Properly sampled intervals with assay results supported by QA/QC.
- Bulk density data. Measured for different rock types and weathering zones to convert volume to tonnes.
- Topography. A reliable digital terrain model, ideally from survey or drone data.
- Geological interpretation. Cross-sections and 3D wireframes that define mineralised domains, faults and weathering surfaces.
- Historic data. Used with caution, only when its reliability can be verified.
Before estimation, data should be validated. Checks include verifying collar coordinates, detecting overlapping intervals, comparing database values to original certificates, and reviewing QA/QC results for bias or contamination.
The Estimation Workflow
1. Geological modelling and domaining. Geologists define mineralised domains, for example, quartz-vein zones, altered shear zones or stratigraphic horizons. Domains should be geologically meaningful, reflecting the controls on mineralisation. Weathering surfaces such as oxide, transition and fresh rock are modelled separately because density and metallurgy differ.
2. Compositing. Drill samples have different lengths. They are composited to a uniform length, such as one or two metres, so that each sample carries equal weight in estimation.
3. Exploratory data analysis. Statistical analysis examines grade distributions, outliers and relationships between elements. Gold data usually shows a skewed distribution, with a few very high grades.
4. Outlier treatment. Extremely high grades can disproportionately influence the estimate. Geologists may cap (top-cut) grades at a justified value or restrict the influence of high grades spatially. This must be documented and defensible.
5. Variography. Variograms measure how grade similarity changes with distance and direction. They quantify continuity and guide the search parameters used in estimation.
6. Block modelling. The deposit is divided into three-dimensional blocks. Block size is chosen based on drill spacing and mining selectivity, typically a fraction of the drill spacing.
7. Grade estimation. Grades are interpolated into blocks using the chosen method.
8. Validation. Estimates are checked visually against drill data, statistically against composites (for example, by swath plots), and, where possible, by reconciliation with production or alternative methods.
9. Classification and reporting. Blocks are classified using geological confidence criteria, and results are tabulated at appropriate cut-off grades.
Estimation Methods
Polygonal and sectional methods. Traditional, manual approaches in which grade is assigned to areas of influence around drill holes or sections. They are simple but ignore spatial variability and can be biased. They may still be used for early-stage or comparison estimates.
Inverse distance weighting (IDW). Block grades are estimated as weighted averages of nearby samples, with closer samples given more weight. It is straightforward and widely used, though weights are not based on measured continuity.
Ordinary kriging. A geostatistical method using the variogram to determine optimal weights and minimise estimation variance. It is the industry standard for many deposit types because it accounts for spatial continuity and clustering.
Indicator kriging and conditional simulation. Used for complex, highly variable grade distributions or to assess uncertainty. They are more advanced and require specialist expertise.
Machine-learning approaches. Emerging methods can supplement traditional estimation but must be validated carefully and are not yet a replacement for established geostatistical practice in public reporting.
The method should match the data and deposit style. Nuggety gold, for example, may require special treatment because of high variability.
Cut-Off Grade and Reasonable Prospects for Eventual Economic Extraction
Resources are reported above a cut-off grade that reflects reasonable assumptions about mining method, processing cost, recovery and commodity price. The Competent Person must explain why the reported mineralisation has reasonable prospects for eventual economic extraction. Open-pit resources are often constrained within an optimised pit shell using conservative parameters, while underground resources may be limited to continuous mineable shapes. Reporting the tonnage and grade at several cut-offs, in a grade-tonnage table, helps readers understand sensitivity.
Reporting Requirements
Technical reports should present information transparently. Typical content includes:
- Project description, location, licence status and access.
- Geology and mineralisation, including deposit style and controls.
- Drilling, sampling, sample preparation and analytical methods.
- QA/QC procedures and results, with an evaluation of data reliability.
- Density measurement methodology.
- Domain modelling and estimation parameters.
- Validation results.
- Classification criteria and rationale.
- Tabulated resource statement with effective date, cut-off grade and category breakdown.
- Risks, uncertainties and recommendations for further work.
The report should name the Competent Person or Qualified Person, state their relevant experience and professional affiliation, and confirm independence where required. If the project is listed on a stock exchange or used for public fundraising, the relevant exchange rules and code requirements apply.
Considerations Specific to Kenya
Weathering and regolith. Deep tropical weathering affects density, grade distribution and metallurgy. Oxide, transition and fresh domains require separate treatment.
Artisanal disturbance. Old workings, backfilled pits and informal mining may have removed or disturbed mineralisation. Mining depletion should be modelled where evidence exists.
Licence and land status. Resource statements should state tenure clearly, because mineral rights, land access and overlapping claims influence the prospects for extraction.
Access to data. Historic exploration data may be incomplete. Verification drilling is often needed to establish reliability.
Community and environmental constraints. Protected areas, settlements and water bodies may limit what can realistically be extracted, and should be noted when considering reasonable prospects.
Common Pitfalls
- Estimating from insufficient or poorly spaced drilling.
- Ignoring QA/QC failures.
- Using unsupported density values.
- Over-smoothing or under-smoothing grade estimates.
- Reporting Inferred resources as if they were reserves.
- Failing to document capping decisions.
- Including mineralised material that clearly lacks prospects for extraction.
Software and Peer Review
Resource modelling is usually carried out using specialised mining software, though open-source and spreadsheet tools can support checks. Whatever software is used, document the parameters and keep the project files so that the estimate can be reproduced. Peer review by a second experienced geologist or geostatistician is a valuable safeguard, catching errors in domain interpretation, capping or classification before they reach investors.
Updating Resource Models
A resource estimate is not permanent. New drilling, revised interpretation, changes in cut-off grade or mining depletion require updates. Record the effective date, compare new and previous estimates and explain differences. Reconciliation against production data, once mining begins, shows how well the model predicts reality and guides improvements to the estimation approach.
Conclusion
Mineral resource estimation in Kenya combines careful data collection, sound geological interpretation, appropriate statistical methods and transparent reporting. By following recognised codes, using validated data, selecting suitable estimation techniques and clearly stating assumptions and uncertainties, project owners produce resource statements that investors and regulators can trust. A credible resource estimate is the foundation for mine planning, financing and responsible development.
For resource modelling and technical reporting support, visit consult.innercoregeoconsultants.co.ke.
This article is general guidance. Public resource reporting should be prepared by a qualified Competent or Qualified Person under the applicable code.