Ore Reserve Estimation and Mine Planning
Spread by sharing

A mineral resource describes what is in the ground. An ore reserve describes what can be mined at a profit. The difference between the two is where many projects succeed or fail. Converting a resource to a reserve means testing geological estimates against the realities of mining methods, ground conditions, processing, infrastructure, legal permissions, environmental standards and commodity prices.

This article explains how ore reserves are estimated, how mine planning follows from them and what these steps mean for mining projects in Kenya.

What Is an Ore Reserve?

Under CRIRSCO-aligned codes such as JORC, NI 43-101 and SAMREC, an ore reserve is the economically mineable part of a Measured and/or Indicated mineral resource. It includes allowances for diluting materials and losses that may occur when the material is mined. Appropriate assessments, at least at pre-feasibility level, must demonstrate that extraction could reasonably be justified at the time of reporting.

Reserves are classified as Probable or Proved. Probable reserves are derived from Indicated resources (and, in some cases, Measured resources where confidence in modifying factors is lower). Proved reserves are derived only from Measured resources and require a high degree of confidence in modifying factors. Inferred resources cannot be converted to reserves.

The Modifying Factors

Converting resources into reserves requires consideration of several modifying factors:

  • Mining: method, dilution, ore loss, selectivity, production rate and ground conditions.
  • Processing: metallurgical recovery, plant capacity and product quality.
  • Infrastructure: power, water, roads, accommodation, tailings and waste storage.
  • Economic: commodity price, exchange rates, costs, royalties and taxes.
  • Marketing: sales terms, offtake and product specification.
  • Legal: licence status, land tenure and permits.
  • Environmental: impacts, closure obligations and compliance.
  • Social and governmental: community support, local content and regulatory approvals.

Each factor must be supported by studies of adequate quality. A reserve statement that ignores any of these is incomplete.

Choosing a Mining Method

The mining method is chosen based on deposit geometry, depth, grade, rock strength, groundwater and environmental setting.

Open-pit mining. Suited to shallow, relatively wide deposits. Waste rock is removed to expose ore, with pit walls designed for stability. Open pits typically allow higher production rates and lower unit costs but disturb larger surface areas. Many oxide gold deposits and industrial mineral operations in Kenya are candidates for open-pit methods.

Underground mining. Suited to deeper or narrow, high-grade orebodies, such as vein-type gold. Methods include cut-and-fill, sublevel stoping and shrinkage stoping. Underground mining is more selective but requires ventilation, ground support, dewatering and stringent safety management.

Alluvial and placer mining. For gold or gemstones in river gravels and terraces, using excavation and gravity separation. It requires careful environmental management to avoid river damage.

Quarrying and surface extraction. For industrial minerals and construction materials, such as limestone, gypsum, fluorspar and sands.

Some projects combine methods, beginning with an open pit and transitioning to underground mining as depth increases.

From Resource Model to Mining Model

The geological block model is adapted to reflect how ore will actually be mined.

Dilution and ore loss. Real mining mixes ore with waste at boundaries and leaves some ore behind. Dilution and recovery factors are applied based on mining selectivity, orebody geometry and ground conditions. Underestimating dilution is a common reason for reserve downgrades.

Selective mining unit (SMU). The smallest volume that can be selectively mined as ore or waste. Block models may be regularised to the SMU size to produce more realistic tonnage and grade estimates.

Geotechnical parameters. Rock mass quality, slope angles, structural features and groundwater determine pit wall angles and underground support needs. Geotechnical drilling, logging, laboratory testing and stability analysis are required.

Hydrogeology. Water inflows affect mining costs and safety. Dewatering and water management plans should be based on field data such as pump tests and piezometer monitoring.

Pit Optimisation and Design

For open-pit projects, software tools use algorithms such as Lerchs–Grossmann or pseudoflow to find the pit shell that maximises value under specified assumptions. Inputs include block values, slope angles, mining cost, processing cost, recovery and price. Engineers then generate nested shells at varying prices to identify the sequence of mining and test sensitivity.

From the optimal shell, practical pit designs are developed with haul roads, benches, berms and ramps. Designs must respect mining equipment dimensions, safety requirements and property boundaries. The final design produces the ore and waste tonnages used for scheduling and reserve reporting.

Underground Design

For underground mines, stope shapes are designed based on mining method, minimum width, stability and grade. Development layouts include access declines or shafts, levels, ventilation raises and services. Engineers assess ground support requirements, ventilation capacity, escape ways and hoisting or haulage systems. Cut-off grades are calculated to reflect higher mining costs.

Cut-Off Grade

Cut-off grade is the minimum grade at which material is treated as ore rather than waste. It is determined from mining, processing and administration costs, recovery, price and royalties. Several types are used, such as break-even, marginal and mill cut-offs. Optimising cut-off grade across the mine life can enhance value. Reserve statements must declare the cut-off or equivalent value used.

Mine Scheduling and Production Planning

Mine schedules sequence extraction over time, balancing ore supply with processing capacity and respecting constraints such as pit stages, development rates, equipment availability and seasonal rain. Scheduling decisions influence cash flow. Higher-grade ore early in the mine life may improve payback, but must be balanced against operational and geotechnical constraints. Annual, quarterly and monthly plans are developed, with short-term plans refined based on grade control data.

Grade Control

Grade control is the day-to-day process of identifying ore and waste for mining. It involves blast-hole or RC sampling, geological mapping of faces, and production reconciliation. Good grade control reduces dilution and ore loss, and gives early warning if the resource model is wrong. Reconciliation compares model predictions to mill results and is a key test of reserve reliability.

Capital and Operating Costs

Mine planning supplies the quantities used in cost estimates: equipment fleets, labour, fuel, explosives, power, maintenance, development metres and infrastructure. Costs should be supported by quotations or benchmarks. In Kenya, factors such as import duties on equipment, fuel prices, grid reliability, skills availability and transport distances influence costs. Contingency should reflect the stage of study and the uncertainty in estimates.

Financial Evaluation

The mine plan feeds a cash flow model that includes revenue, operating cost, capital cost, royalties, taxes, working capital and closure costs. Outputs include net present value, internal rate of return, payback and sensitivity analysis. A reserve is only legitimate if the economic analysis shows a positive outcome under reasonable assumptions.

Environmental, Social and Closure Planning

Mine plans must integrate waste rock management, tailings design, water use, dust control, biodiversity protection and rehabilitation. In Kenya, an approved environmental and social impact assessment, water permits and community agreements shape the plan. Closure planning, including progressive rehabilitation and financial provision, should be designed from the start. Mining that ignores these considerations risks delays, penalties and reputational damage.

Reporting and Competence

Ore reserve statements must be prepared by or under the supervision of a Competent Person or Qualified Person with relevant mining engineering experience. Reports should present the resource basis, modifying factors, mining method, dilution and recovery, cut-off grade, economic assumptions and classification. The reserve must be reported as a subset of, or in addition to, the resource, with clear statements to avoid double counting.

Common Pitfalls

  • Converting Inferred resources into reserves.
  • Using unrealistically low dilution or high recovery.
  • Ignoring geotechnical or hydrogeological risk.
  • Basing economics on optimistic commodity prices.
  • Underestimating infrastructure and permitting requirements.
  • Neglecting grade control planning.
  • Treating mine planning as a one-time exercise instead of an ongoing process.

Reserve Updates and Reconciliation

Reserves change over time as prices, costs, ground conditions and resource models evolve. Operating mines should update reserves at least annually, reconcile mined tonnes and grades with model predictions and investigate large differences. Reconciliation data are the most honest test of a reserve estimate. Persistent over-prediction signals problems with sampling, estimation, dilution assumptions or grade control, and should trigger review.

Mine Planning Software and Skills

Modern mine planning uses specialised software for pit optimisation, design and scheduling, but the results depend on sound inputs and experienced judgement. Small and mid-sized Kenyan projects benefit from engaging mining engineers who understand local equipment availability, labour skills and cost conditions. Training local technical staff in surveying, grade control and planning builds capability that serves the mine throughout its life.

Conclusion

Ore reserve estimation and mine planning bridge geology and engineering. They test whether a resource can be mined and processed profitably within legal, environmental and social boundaries. For Kenyan mining projects, success depends on reliable resource models, realistic modifying factors, appropriate mining methods, careful scheduling and integrated planning for people and the environment. A well-prepared reserve and mine plan strengthens financing, reduces operational surprises and supports responsible development.

For help linking geological data to mine planning, visit consult.innercoregeoconsultants.co.ke.

This article is general guidance. Reserve statements must be prepared by qualified professionals under the applicable reporting code.


Spread by sharing

Geol Githae

Geol. Mbugua Githae is a dedicated and skilled geologist with expertise in geological mapping, mineral exploration, and geotechnical investigations. With a strong academic background and hands-on experience in both field and laboratory settings, he brings a practical, analytical approach to solving complex geological challenges. Passionate about sustainable resource development and environmental stewardship, Geol. Githae continues to contribute meaningfully to the advancement of earth sciences in the region.